Publishing Service

Polishing & Checking

Journal of Zhejiang University SCIENCE A

ISSN 1673-565X(Print), 1862-1775(Online), Monthly

Using sequential analysis procedures to rank the influencing factors of public work’s quality

Abstract: In order to improve the efficiency in management of public work projects, screening and controlling influencing factors affecting the quality of a public work project is essential. This study synthesized 9 influential categories including 91 factors related to quality management of public works in Taiwan using a sequential analysis procedure. According to the Borda-values of influencing factors obtained from a first stage questionnaire, the number of primary factors selected by the responsible entities and the design-supervisory entities were 44 and 45 respectively. A Fuzzy Analytic Hierarchy Process (FAHP) was used to prioritize and rank these factors. The top five factors ranked by the responsible entities were (1) introduction of the earned value analysis, (2) working efficiency, (3) environmental laws and regulations, (4) price-index fluctuation, and (5) on-site safety management. The top five factors ranked by the design-supervisory entities were (1) man power, (2) laws and regulations, (3) price-index fluctuation, (4) traffic conditions, and (5) faulty design.

Key words: FAHP, Public works, Quality management, Influencing factors


Share this article to: More

Go to Contents

References:

<Show All>

Open peer comments: Debate/Discuss/Question/Opinion

<1>

Please provide your name, email address and a comment





DOI:

10.1631/jzus.2006.A0330

CLC number:

TP391

Download Full Text:

Click Here

Downloaded:

3099

Clicked:

5690

Cited:

0

On-line Access:

2024-08-27

Received:

2023-10-17

Revision Accepted:

2024-05-08

Crosschecked:

Journal of Zhejiang University-SCIENCE, 38 Zheda Road, Hangzhou 310027, China
Tel: +86-571-87952276; Fax: +86-571-87952331; E-mail: jzus@zju.edu.cn
Copyright © 2000~ Journal of Zhejiang University-SCIENCE