|
Journal of Zhejiang University SCIENCE A
ISSN 1673-565X(Print), 1862-1775(Online), Monthly
2011 Vol.12 No.8 P.637-644
Effect of soil set-up on the capacity of jacked concrete pipe piles in mixed soils
Abstract: The increase in capacity of displacement piles with time after installation is typically known as soil/pile set-up. A full-scale field test is carried out to observe the set-up effect for open-ended concrete pipe piles jacked into mixed soils. Both the total capacity and the average unit shaft resistance increase approximately linearly with logarithmic time. The average increase rate for unit shaft resistance is 44% per log cycle, while the average increase for total capacity is approximately 21%. A review on case histories for long-term set-up indicates an average set-up rate of approximately 40%. Based on this, the mechanism of pile set-up is discussed in detail and a three-phase model is suggested.
Key words: Concrete pipe pile, Jack piling, Set-up, Pile capacity
References:
Open peer comments: Debate/Discuss/Question/Opinion
<1>
CelayLalgeBog@No address<acibioppy@hotmail.com>
2013-04-26 02:04:58
???? ?????? ???-?????? ?????? ?????? ?????? ?? ?????? ? ???????
DOI:
10.1631/jzus.A1000503
CLC number:
TU473
Download Full Text:
Downloaded:
4115
Clicked:
6679
Cited:
2
On-line Access:
2024-08-27
Received:
2023-10-17
Revision Accepted:
2024-05-08
Crosschecked:
2011-07-15