Construction simulation approach of roller-compacted concrete dam based on real-time monitoring

Abstract: The parameters of existing roller-compacted concrete (RCC) dam construction simulation are usually fixed based on experience while the actual construction conditions of an RCC dam change during the process of the project. The simulation accuracy of an RCC dam is therefore reduced because the change has not been considered. A new method for RCC dam construction simulations based on real-time monitoring is presented in this paper. First, real-time monitoring technology is used to collect and analyze the actual construction information. Second, meteorological data obtained from the real-time monitoring system are analyzed using the fuzzy average function method, and the weather conditions of the next stage are forecasted. Then the construction schedule simulation model is updated via the Bayesian update method. Results of the analysis are used as the input to the construction simulation parameters, and the construction simulation is performed. A real-world engineering example is presented to compare the simulation results with the actual construction schedule. The results demonstrate that the method can effectively improve the accuracy and real-time performance of construction simulations.

Key words: Roller-compacted concrete (RCC) dam; Construction simulation; Real-time monitoring; Bayesian update; Fuzzy mean generating function

Chinese Summary  <32> 基于实时监控的碾压混凝土坝施工仿真

关键词组:碾压混凝土坝;施工仿真;实时监控;贝叶斯更新;模糊均生函数


Share this article to: More

Go to Contents

References:

<Show All>

Open peer comments: Debate/Discuss/Question/Opinion

<1>

Please provide your name, email address and a comment





DOI:

10.1631/jzus.A1700042

CLC number:

TV512

Download Full Text:

Click Here

Downloaded:

3137

Download summary:

<Click Here> 

Downloaded:

2067

Clicked:

5722

Cited:

0

On-line Access:

2024-08-27

Received:

2023-10-17

Revision Accepted:

2024-05-08

Crosschecked:

2018-04-11

Journal of Zhejiang University-SCIENCE, 38 Zheda Road, Hangzhou 310027, China
Tel: +86-571-87952276; Fax: +86-571-87952331; E-mail: jzus@zju.edu.cn
Copyright © 2000~ Journal of Zhejiang University-SCIENCE