Geometric state transfer method for construction control of a large-segment steel box girder with hoisting installation

Abstract: This paper aims to address the problem of geometric state control of large-segment steel box girders in offshore hoisting during the construction of large-span bridges. First, the geometric state control indexes of a large-segment steel box girder are determined, such as the manufacturing parameters of the top and bottom slabs, the width of the annular joint, and the support position. Second, the geometric state equations and state transfer matrixes of large-segment steel box girders under different conditions are deduced by taking the mileage and elevation of control points as basic state variables. In application of the geometric state transfer method in the construction control of the Hong Kong-Zhuhai-Macao Bridge, the width of the annular joint and the position parameters for the support of the large-segment steel box girder are predicted precisely. Moreover, the manufacturing parameters of the top and bottom slabs of the steel box girders are calculated reliably. The measured values show that the width of the annular joint is basically the same with the difference of less than 2 mm, the eccentricity of bridge support is less than 20 mm, and the elevation error of the bridge deck is within −10 mm to +15 mm, which meets the construction accuracy. Using the geometric state transfer method, the rapid and accurate installation of the Hong Kong-Zhuhai-Macao Bridge has been realized, demonstrating that the precise control of the geometric state of a steel box girder with ectopic installation and multi-state transition can be realized by using the geometric state transfer method.

Key words: Large-segment steel box girder; Offshore hoisting; Construction control; Geometric state; Transfer matrix

Chinese Summary  <22> 基于几何状态传递的大节段钢箱梁吊装施工控制

关键词组:大节段钢箱梁; 海上吊装; 施工控制; 几何状态; 传递矩阵


Share this article to: More

Go to Contents

References:

<Show All>

Open peer comments: Debate/Discuss/Question/Opinion

<1>

Please provide your name, email address and a comment





DOI:

10.1631/jzus.A1900213

CLC number:

U445

Download Full Text:

Click Here

Downloaded:

2320

Download summary:

<Click Here> 

Downloaded:

1762

Clicked:

3245

Cited:

0

On-line Access:

2020-05-11

Received:

2019-06-16

Revision Accepted:

2019-11-08

Crosschecked:

2020-03-17

Journal of Zhejiang University-SCIENCE, 38 Zheda Road, Hangzhou 310027, China
Tel: +86-571-87952276; Fax: +86-571-87952331; E-mail: jzus@zju.edu.cn
Copyright © 2000~ Journal of Zhejiang University-SCIENCE