RUAN Lian-fa, XIONG Ying, WANG You-sheng. CONSTRUCTION COST INTEGRATED CONTROL BASED ON COMPUTER SIMULATION[J]. Journal of Zhejiang University Science A, 2001, 2(1): 28-33.
@article{title="CONSTRUCTION COST INTEGRATED CONTROL BASED ON COMPUTER SIMULATION",
author="RUAN Lian-fa, XIONG Ying, WANG You-sheng",
journal="Journal of Zhejiang University Science A",
volume="2",
number="1",
pages="28-33",
year="2001",
publisher="Zhejiang University Press & Springer",
doi="10.1631/jzus.2001.0028"
}
%0 Journal Article
%T CONSTRUCTION COST INTEGRATED CONTROL BASED ON COMPUTER SIMULATION
%A RUAN Lian-fa
%A XIONG Ying
%A WANG You-sheng
%J Journal of Zhejiang University SCIENCE A
%V 2
%N 1
%P 28-33
%@ 1869-1951
%D 2001
%I Zhejiang University Press & Springer
%DOI 10.1631/jzus.2001.0028
TY - JOUR
T1 - CONSTRUCTION COST INTEGRATED CONTROL BASED ON COMPUTER SIMULATION
A1 - RUAN Lian-fa
A1 - XIONG Ying
A1 - WANG You-sheng
J0 - Journal of Zhejiang University Science A
VL - 2
IS - 1
SP - 28
EP - 33
%@ 1869-1951
Y1 - 2001
PB - Zhejiang University Press & Springer
ER -
DOI - 10.1631/jzus.2001.0028
Abstract: construction cost control is a complex system engineering. The traditional controlling method cannot dynamically control in advance the construction cost because of its hysteresis. This paper proposes a computer simulation based construction cost integrated control method, which combines the cost with PERT systematically, so that the construction cost can be predicted and optimized systematically and effectively. The new method overcomes the hysteresis of the traditional systems, and is a distinct improvement over them in effect and practicality.
[1] Mitrani I., 1982. Simulation Techniques for Discrete Event Systems. Cambridge University, Pergamon Press, p.40-42.
[2] Wang Shouqing, 1996. Computer's Application in Cost Estimation in ConstructionEngineering, Tsinghua Press, Beijing, p.15-17.
[3] Xie Xinghao, Han Gengzai, 1988. Computer Simulation and Analysis of the Reliability of the Average Value of the Total Project Duration by PERT. Journal of Xi'an Construction and Technology University, 7(1):29-36.
[4] Zhao Wei, Xie Xinghao, 1988. Simulation and Application of Computer. Construction Industry Press of China, Beijing, p.30-35.
[5] Zhu Yan, 1998. Cost Management in Construction Engineering. Construction Industry Press of China, Beijing, p.10-12.
Open peer comments: Debate/Discuss/Question/Opinion
<1>