ZHANG Zhi-cheng, XIE Xu, ZHANG He, CHEN Heng-zhi. Approach for analyzing the ultimate strength of concrete filled steel tubular arch bridges with stiffening girder[J]. Journal of Zhejiang University Science A, 2007, 8(5): 682-692.
@article{title="Approach for analyzing the ultimate strength of concrete filled steel tubular arch bridges with stiffening girder",
author="ZHANG Zhi-cheng, XIE Xu, ZHANG He, CHEN Heng-zhi",
journal="Journal of Zhejiang University Science A",
volume="8",
number="5",
pages="682-692",
year="2007",
publisher="Zhejiang University Press & Springer",
doi="10.1631/jzus.2007.A0682"
}
%0 Journal Article
%T Approach for analyzing the ultimate strength of concrete filled steel tubular arch bridges with stiffening girder
%A ZHANG Zhi-cheng
%A XIE Xu
%A ZHANG He
%A CHEN Heng-zhi
%J Journal of Zhejiang University SCIENCE A
%V 8
%N 5
%P 682-692
%@ 1673-565X
%D 2007
%I Zhejiang University Press & Springer
%DOI 10.1631/jzus.2007.A0682
TY - JOUR
T1 - Approach for analyzing the ultimate strength of concrete filled steel tubular arch bridges with stiffening girder
A1 - ZHANG Zhi-cheng
A1 - XIE Xu
A1 - ZHANG He
A1 - CHEN Heng-zhi
J0 - Journal of Zhejiang University Science A
VL - 8
IS - 5
SP - 682
EP - 692
%@ 1673-565X
Y1 - 2007
PB - Zhejiang University Press & Springer
ER -
DOI - 10.1631/jzus.2007.A0682
Abstract: A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate the stiffening girder and CFST arch rib. The geometric nonlinearity, material nonlinearity, influence of the construction process and the contribution of prestressing reinforcement are all taken into consideration. The accuracy of this method is validated by comparing its results with experimental results. Finally, the ultimate strength of an abnormal CFST arch bridge with stiffening girders is investigated and the effect of construction method is discussed. It is concluded that the construction process has little effect on the ultimate strength of the bridge.
[1] Chen, H.Z., 2005. Research of Calculation and Analysis of PC Box Girder Structure with Long Span. Ph.D Thesis, Zhejiang University (in Chinese).
[2] Chen, B.C., Chen, Y.J., 2000. Experimental study on mechanic behaviors of concrete-filled steel tubular rib arch under in-plane loads. Engineering Mechanics, 17(2):44-50 (in Chinese).
[3] Chen, B.C., Wei, J.G., Lin, J.Y., 2006. Experimental study on concrete filled steel tubular (single tube) arch with one rib under spatial loads. Engineering Mechanics, 23(5):99-106 (in Chinese).
[4] Crisfield, M.A., 1981. A fast incremental iterative solution procedure that handles “snap through”. Computer and Structures, 13(1-3):55-62.
[5] Cui, J., Sun, B.N., Lou, W.J., Yang, L.X., 2004. Model test study on concrete-filled steel tube truss arch bridge. Engineering Mechanics, 21(5):83-86 (in Chinese).
[6] Han, L.H., 2000. Steel Tube Confined Concrete Structures. Science Press, Beijing, p.180-190 (in Chinese).
[7] Hu, Q.A., Zhou, X. S., Zhu, H., 2006. Impacts of Poisson ratio on ultimate bearing capacity of concrete filled steel tubular arch bridge. Chinese Journal of Applied Mechanics, 23(1):128-131 (in Chinese).
[8] Xie, X., Nagai, M., Yamaguchi, H., 1998. Ultimate strength analysis of long-span cable-stayed bridges. Journal of Structural Mechanics and Earthquake Engineering, JSCE, 598(I-44):171-181 (in Japanese).
[9] Xie, X., Chen, H.Z., Li, H., Song, S.R., 2005. Numerical analysis of ultimate strength of concrete filled steel tubular arch bridges. Journal of Zhejiang University SCIENCE, 6A(8):859-868.
[10] Zeng, G.F., Fan, L.C., Zhang, G.Y., 2003. Load capacity analysis of concrete filled steel tube arch bridge with the composite beam element. Journal of the China Railway Society, 25(5):97-102 (in Chinese).
[11] Zhang, Z.A., Sun, Y., Wang, M.Q., 2003. Key technique in the erection process of the rib steel pipe truss segments for Wushan Yangze River bridge. Highway, 12:26-32 (in Chinese).
[12] Zhang, Y., Shao, X.D., Cai, S.B., Hu, J.H., 2006. Spatial nonlinear finite element analysis for long-span trussed CFST arch bridge. China Journal of Highway and Transport, 19(4):65-70 (in Chinese).
[13] Zhao, L.Q., Xu, R.H., Zheng, X.Z., 2004. Overall design of the fourth Qiantangjiang River Bridge in Hangzhou. Bridge Construction, 1:27-30 (in Chinese).
Open peer comments: Debate/Discuss/Question/Opinion
<1>