Full Text:   <3355>

CLC number: O32

On-line Access: 2024-08-27

Received: 2023-10-17

Revision Accepted: 2024-05-08

Crosschecked: 0000-00-00

Cited: 0

Clicked: 6404

Citations:  Bibtex RefMan EndNote GB/T7714

-   Go to

Article info.
Open peer comments

Journal of Zhejiang University SCIENCE A 2008 Vol.9 No.3 P.330-337

http://doi.org/10.1631/jzus.A071365


Optimization of time-delayed feedback control of seismically excited building structures


Author(s):  Xue-ping LI, Wei-qiu ZHU, Zu-guang YING

Affiliation(s):  Department of Mechanics, School of Aeronautics and Astronautics, State Key Laboratory of Fluid Power Transmission and Control, Zhejiang University, Hangzhou 310027, China

Corresponding email(s):   xiaoxiaopingli@hotmail.com, wqzhu@yahoo.com

Key Words:  Time-delayed feedback control, Stochastic averaging method, Hamiltonian, Earthquake


Xue-ping LI, Wei-qiu ZHU, Zu-guang YING. Optimization of time-delayed feedback control of seismically excited building structures[J]. Journal of Zhejiang University Science A, 2008, 9(3): 330-337.

@article{title="Optimization of time-delayed feedback control of seismically excited building structures",
author="Xue-ping LI, Wei-qiu ZHU, Zu-guang YING",
journal="Journal of Zhejiang University Science A",
volume="9",
number="3",
pages="330-337",
year="2008",
publisher="Zhejiang University Press & Springer",
doi="10.1631/jzus.A071365"
}

%0 Journal Article
%T Optimization of time-delayed feedback control of seismically excited building structures
%A Xue-ping LI
%A Wei-qiu ZHU
%A Zu-guang YING
%J Journal of Zhejiang University SCIENCE A
%V 9
%N 3
%P 330-337
%@ 1673-565X
%D 2008
%I Zhejiang University Press & Springer
%DOI 10.1631/jzus.A071365

TY - JOUR
T1 - Optimization of time-delayed feedback control of seismically excited building structures
A1 - Xue-ping LI
A1 - Wei-qiu ZHU
A1 - Zu-guang YING
J0 - Journal of Zhejiang University Science A
VL - 9
IS - 3
SP - 330
EP - 337
%@ 1673-565X
Y1 - 2008
PB - Zhejiang University Press & Springer
ER -
DOI - 10.1631/jzus.A071365


Abstract: 
An optimization method for time-delayed feedback control of partially observable linear building structures subjected to seismic excitation is proposed. A time-delayed control problem of partially observable linear building structure under horizontal ground acceleration excitation is formulated and converted into that of completely observable linear structure by using separation principle. The time-delayed control forces are approximately expressed in terms of control forces without time delay. The control system is then governed by Itô stochastic differential equations for the conditional means of system states and then transformed into those for the conditional means of modal energies by using the stochastic averaging method for quasi-hamiltonian systems. The control law is assumed to be modal velocity feedback control with time delay and the unknown control gains are determined by the modal performance indices. A three-storey building structure is taken as example to illustrate the proposal method and the numerical results are confirmed by using Monte Carlo simulation.

Darkslateblue:Affiliate; Royal Blue:Author; Turquoise:Article

Reference

[1] Agrawal, A.K., Yang, J.N., 1997. Effect of fixed time delay on stability and performance of actively controlled civil engineering structures. Earthquake Engineering & Structural Dynamics, 26(11):1169-1185.

[2] Agrawal, A.K., Yang, J.N., 2000. Compensation of time-delay for control civil engineering structures. Earthquake Engineering & Structural Dynamics, 29(1):37-62.

[3] Bensoussan, A., 1992. Stochastic Control of Partially Observable Systems. Cambridge University Press, Cambridge.

[4] Cai, G., Huang, J., 2002. Optimal control method for seismically excited building structures with time delay in control. Journal of Engineering Mechanics, 128(6):602-612.

[5] Choksy, N.H., 1962. Time lag systems. Progress in Control Engineering, 1:17-38.

[6] Fleming, W.H., Soner, H.M., 1993. Controlled Markov Processes and Viscosity Solutions. Springer, New York.

[7] Hu, H.Y., Wang, Z.H., 2002. Dynamics of Controlled Mechanical Systems with Delayed Feedback. Springer-Verlag, Berlin.

[8] Liao, J.J., Wang, A.P., Ho, C.M., Hwang, Y.D., 2002. A robust control of a dynamic beam structure with time delay effect. Journal of Sound and Vibration, 252(5):835-847.

[9] Liu, Z.H., Zhu, W.Q., 2007. Stochastic averaging of quasi-integrable Hamiltonian systems with delayed feedback control. Journal of Sound and Vibration, 299(1-2):178-195.

[10] Marshall, J.E., 1974. Extensions of O.J. Smith’s method to digital, other systems. International Journal of Control, 19(5):933-939.

[11] Phohomsiri, P., Udwadia, F.E., von Bremen, H.F., 2006. Time-delayed positive velocity feedback control design for active control of structures. Journal of Engineering Mechanics, 132(6):690-703.

[12] Sain, P.M., Spencer, B.F., Sain, M.K., Suhardjo, J., 1992. Structural Control Design in the Presence of Time Delays. Proceedings of the 9th Engineering Mechanics Conference, ASCE, College Station, p.24-27.

[13] Udwadia, F.E., von Bremen, H., Phohomsiri, P., 2007. Time-delayed control design for active control of structures: principles and applications. Structural Control and Health Monitoring, 14(1):27-61.

[14] Yong, J.M., Zhou, X.Y., 1999. Stochastic Control Hamiltonian Systems and HJB Equation. Springer, New York.

[15] Zhu, W.Q., Ying, Z.G., 1999. Optimal nonlinear feedback control of quasi Hamiltonian systems. Science in China, Series A, 42:1213-1219.

[16] Zhu, W.Q., Huang, Z.L., Yang, Y.Q., 1997. Stochastic averaging of quasi integrable Hamiltonian systems. ASME Journal of Applied Mechanics, 64:975-984.

[17] Zhu, W.Q., Ying, Z.G., Soong, T.T., 2001. An optimal nonlinear feedback control strategy for randomly excited structural systems. Nonlinear Dynamics, 24(1):31-51.

Open peer comments: Debate/Discuss/Question/Opinion

<1>

Please provide your name, email address and a comment





Journal of Zhejiang University-SCIENCE, 38 Zheda Road, Hangzhou 310027, China
Tel: +86-571-87952783; E-mail: cjzhang@zju.edu.cn
Copyright © 2000 - 2024 Journal of Zhejiang University-SCIENCE