Full Text:   <2400>

Summary:  <1815>

CLC number: TV31

On-line Access: 2018-04-04

Received: 2016-11-30

Revision Accepted: 2017-05-25

Crosschecked: 2018-03-07

Cited: 0

Clicked: 5846

Citations:  Bibtex RefMan EndNote GB/T7714

 ORCID:

Bin-ping Wu

https://orcid.org/0000-0002-9398-9078

-   Go to

Article info.
Open peer comments

Journal of Zhejiang University SCIENCE A 2018 Vol.19 No.4 P.289-303

http://doi.org/10.1631/jzus.A1600753


Rockfill dam compaction quality evaluation based on cloud-fuzzy model


Author(s):  Fei Wang, Deng-hua Zhong, Yu-ling Yan, Bing-yu Ren, Bin-ping Wu

Affiliation(s):  State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China

Corresponding email(s):   wubinping@tju.edu.cn

Key Words:  Rockfill dam, Cloud model, Uncertainty, Compaction quality evaluation


Fei Wang, Deng-hua Zhong, Yu-ling Yan, Bing-yu Ren, Bin-ping Wu. Rockfill dam compaction quality evaluation based on cloud-fuzzy model[J]. Journal of Zhejiang University Science A, 2018, 19(4): 289-303.

@article{title="Rockfill dam compaction quality evaluation based on cloud-fuzzy model",
author="Fei Wang, Deng-hua Zhong, Yu-ling Yan, Bing-yu Ren, Bin-ping Wu",
journal="Journal of Zhejiang University Science A",
volume="19",
number="4",
pages="289-303",
year="2018",
publisher="Zhejiang University Press & Springer",
doi="10.1631/jzus.A1600753"
}

%0 Journal Article
%T Rockfill dam compaction quality evaluation based on cloud-fuzzy model
%A Fei Wang
%A Deng-hua Zhong
%A Yu-ling Yan
%A Bing-yu Ren
%A Bin-ping Wu
%J Journal of Zhejiang University SCIENCE A
%V 19
%N 4
%P 289-303
%@ 1673-565X
%D 2018
%I Zhejiang University Press & Springer
%DOI 10.1631/jzus.A1600753

TY - JOUR
T1 - Rockfill dam compaction quality evaluation based on cloud-fuzzy model
A1 - Fei Wang
A1 - Deng-hua Zhong
A1 - Yu-ling Yan
A1 - Bing-yu Ren
A1 - Bin-ping Wu
J0 - Journal of Zhejiang University Science A
VL - 19
IS - 4
SP - 289
EP - 303
%@ 1673-565X
Y1 - 2018
PB - Zhejiang University Press & Springer
ER -
DOI - 10.1631/jzus.A1600753


Abstract: 
The quality of compaction is key to the safety of dam construction and operation. However, because of incomplete information about the construction process and the unknown relationship between compaction quality and the factors that influence it, traditional evaluation methods such as neural networks and multivariate linear regression models fail to take uncertainty fully into account. This paper proposes a cloud-fuzzy method for assessing compaction quality by considering randomness, fuzziness, and incomplete information. The compaction parameters and material source parameters are the key parameters in the assessment of compaction quality. A five-layer neural-network model of compaction quality assessment is established that considers compacted dry density and its classification membership and probability as the criteria, and the rolling speed, rolling passes, and compacted layer thickness as alternatives. Because of uncertainties in the criteria and alternatives, the cloud-fuzzy method, in which a fuzzy neural network is extended with a cloud model to handle uncertain and fuzzy problems more effectively, is introduced to determine the compaction quality. A case study is presented to evaluate the compaction quality of a hydropower project in China. The results indicate that the cloud-fuzzy model is feasible in relation to precision and makes up for the sole focus on precision by traditional methods. The proposed method provides a triple index for understanding compaction quality, which facilitates assessment of the compaction quality of an entire dam surface.

This manuscript proposed a cloud-fuzzy evaluation method to assess the compaction quality of rock-fill dam by taking into randomness, fuzziness and incomplete information into consideration. Compared to other traditional method, this proposed method provided a triple index to understand and evaluate the compaction quality. The results can be of great useful for rock-fill dam compaction quality evaluation.

基于云-模糊模型的堆石坝施工质量评估

目的:施工质量对于大坝建设期及运行期的安全至关重要.由于施工过程中的信息不完备及碾压质量与影响因素之间的关系并不是完全确定等原因,传统的评估方法很少考虑不确定性对施工质量的影响.本文旨在探讨考虑不确定性影响的碾压质量评估方法,改善施工质量评估的可信性.
创新点:1. 通过研究模糊神经网络与径向基神经网络,结合云模型建立云-模糊模型; 2. 建立施工质量三指标体系评价方法.
方法:1. 通过碾压质量实时监控系统和现场试坑试验获取参数数据; 2. 通过云分析,建立云-模糊模型; 3. 对比不同的模型,验证云-模糊模型的可行性; 4. 利用验证的云-模糊模型对大坝施工仓面进行压实干密度预测; 5. 计算评价体系的三指标,对施工质量进行评估.
结论:1. 云-模糊模型不但能在精度上满足预测要求,而且能够综合考虑施工质量与影响因素之间的不确定性关系; 2. 云-模糊评价方法弥补了传统评价方法仅追求精度的单一性,使得施工质量评价更符合客观规律; 3. 提出的施工质量三指标评价体系充实了传统的评价方法,能够更客观地指导实际工程建设.

关键词:堆石坝;云模型;不确定性;施工质量评价

Darkslateblue:Affiliate; Royal Blue:Author; Turquoise:Article

Reference

[1]Anderegg R, Kaufmann K, 2004. Intelligent compaction with vibratory rollers. Transportation Research Record: Journal of the Transportation Research Board, 1868(1):124-134.

[2]Anderegg R, von Felten DA, Kaufmann K, 2006. Compaction monitoring using intelligent soil compactors. Proceedings of the GeoCongress 2006: Geotechnical Engineering in the Information Technology Age, p.41-46.

[3]Bas MC, Ortiz J, Ballesteros L, et al., 2017. Evaluation of a multiple linear regression model and SARIMA model in forecasting 7Be air concentrations. Chemosphere, 177: 326-333.

[4]Fu B, Li DG, Wang MK, 2011. Review and prospect on research of cloud model. Application Research of Computers, 28(2):420-426 (in Chinese).

[5]Kaufmann K, Anderegg R, 2008. 3D-construction applications III: GPS-based compaction technology. Proceedings of the 1st International Conference on Machine Control & Guidance, p.1-10.

[6]Komandi G, 1999. An evaluation of the concept of rolling resistance. Journal of Terramechanics, 36(3):159-166.

[7]Li DR, Wang SL, Li DY, 2006. The Theory of Space Data Dating and Application. Science Press, Beijing, China, p.330-331 (in Chinese).

[8]Li DY, Du Y, 2014. Artificial Intelligence with Uncertainty. National Defense Industry Press, Beijing, China, p.105-106 (in Chinese).

[9]Liu DH, Wang GF, 2014. Compaction quality evaluation of the entire rolled unit of earth dam based on real-time monitoring. Journal of Hydraulic Engineering, 41(6):720-726 (in Chinese).

[10]Liu DH, Sun J, Zhong DH, et al., 2012. Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9):1085-1094.

[11]Mao YY, Zhang XG, Wang LS, 2006. Fuzzy pattern recognition method for assessing groundwater vulnerability to pollution in the Zhangji area. Journal of Zhejiang University-SCIENCE A, 7(11):1917-1922.

[12]Mirinejad H, Inanc T, 2017. An RBF collocation method for solving optimal control problems. Robotics and Autonomous Systems, 87:219-225.

[13]Mooney MA, Rinehart RV, 2007. Field monitoring of roller vibration during compaction of subgrade soil. Journal of Geotechnical and Geoenvironmental Engineering, 133(3):257-265.

[14]Qin K, Wang P, 2008. New method of curve fitting based on cloud transform. Computer Engineering and Applications, 44(23):56-58 (in Chinese).

[15]Rinehart RV, Mooney MA, 2008. Instrumentation of a roller compactor to monitor vibration behavior during earthwork compaction. Automation in Construction, 17(2):144-150.

[16]Sandstrom A, Pettersson JC, 2004. Intelligent systems for QA/QC in soil compaction. Proceedings of the 83rd Annual Transportation Research Board Meeting, p.1-17.

[17]Song JJ, Du XP, Wang Q, et al., 2011. A method of multi-attribute synthetic evaluation based on cloud model. Key Engineering Materials, 480-481:805-809.

[18]Wang DY, Luo HY, Grunder O, et al., 2017. Multi-step ahead electricity price forecasting using a hybrid model based on two-layer decomposition technique and BP neural network optimized by firefly algorithm. Applied Energy, 190:390-407.

[19]Wang GY, Xu CL, 2012. Cloud model–a bidirectional cognition model between concept’s extension and intension. International Conference on Advanced Machine Learning Technologies and Applications (AMLTA 2012), p.391-400.

[20]Wang GY, Xu CL, Li DY, 2014. Generic normal cloud model. Information Sciences, 280:1-15.

[21]Wang R, Zhong DH, Wu BP, et al., 2015. Compaction quality evaluation of rockfill dam based on compaction and material parameters. Journal of Hydroelectric Engineering, 34(9):146-152 (in Chinese).

[22]Wang XL, Zhou L, Ren BY, et al., 2015. Dual evaluation on rolling compaction quality of rock-fill dam based on real-time monitoring. Journal of Hydroelectric Engineering, 34(2):164-170 (in Chinese).

[23]White DJ, Rupnow TD, Ceylan H, 2004. Influence of subgrade/subbase non-uniformity on PCC pavement performance. GeoTrans 2004-Geotechnical Engineering for Transportation Projects, p.1058-1065.

[24]Zeng QH, Liu Y, Zhao HT, et al., 2017. Comparison of models for predicting the changes in phytoplankton community composition in the receiving water system of an inter-basin water transfer project. Environmental Pollution, 223:676-684.

[25]Zhong DH, Cui B, Liu DH, 2009. Theoretical research on construction quality real-time monitoring and system integration of core rock-fill dam. Science in China Series E: Technological Sciences, 52(11):3406-3412.

[26]Zhong DH, Liu DH, Cui B, 2011. Real-time compaction quality monitoring of high core rockfill dam. Science China Technological Sciences, 54(7):1906-1913.

[27]Zhong DH, Hu W, Wu BP, et al., 2017. Dynamic time-cost-quality tradeoff of rockfill dam construction based on real-time monitoring. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 18(1):1-19.

[28]Zhu Q, Xu X, Gao CH, et al., 2015. Qualitative and quantitative uncertainties in regional rainfall frequency analysis. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 16(3):194-203.

Open peer comments: Debate/Discuss/Question/Opinion

<1>

Please provide your name, email address and a comment





Journal of Zhejiang University-SCIENCE, 38 Zheda Road, Hangzhou 310027, China
Tel: +86-571-87952783; E-mail: cjzhang@zju.edu.cn
Copyright © 2000 - 2024 Journal of Zhejiang University-SCIENCE