Full Text:   <3214>

CLC number: TV5

On-line Access: 2024-08-27

Received: 2023-10-17

Revision Accepted: 2024-05-08

Crosschecked: 2010-04-30

Cited: 2

Clicked: 5693

Citations:  Bibtex RefMan EndNote GB/T7714

-   Go to

Article info.
Open peer comments

Journal of Zhejiang University SCIENCE A 2010 Vol.11 No.6 P.425-431

http://doi.org/10.1631/jzus.A0900620


Simulation of filling construction of permeable geosynthetic tubes


Author(s):  Wei-chao Liu, Yi-ping Zhang, Tao Li, Ya-nan Yu

Affiliation(s):  College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China, Zhejiang Water Conservancy and Hydropower College, Hangzhou 310018, China

Corresponding email(s):   zhangyiping@zju.edu.cn

Key Words:  Geosynthetic tube, Filling construction, Simulation, Volume of the tube, Drainage rate


Wei-chao Liu, Yi-ping Zhang, Tao Li, Ya-nan Yu. Simulation of filling construction of permeable geosynthetic tubes[J]. Journal of Zhejiang University Science A, 2010, 11(6): 425-431.

@article{title="Simulation of filling construction of permeable geosynthetic tubes",
author="Wei-chao Liu, Yi-ping Zhang, Tao Li, Ya-nan Yu",
journal="Journal of Zhejiang University Science A",
volume="11",
number="6",
pages="425-431",
year="2010",
publisher="Zhejiang University Press & Springer",
doi="10.1631/jzus.A0900620"
}

%0 Journal Article
%T Simulation of filling construction of permeable geosynthetic tubes
%A Wei-chao Liu
%A Yi-ping Zhang
%A Tao Li
%A Ya-nan Yu
%J Journal of Zhejiang University SCIENCE A
%V 11
%N 6
%P 425-431
%@ 1673-565X
%D 2010
%I Zhejiang University Press & Springer
%DOI 10.1631/jzus.A0900620

TY - JOUR
T1 - Simulation of filling construction of permeable geosynthetic tubes
A1 - Wei-chao Liu
A1 - Yi-ping Zhang
A1 - Tao Li
A1 - Ya-nan Yu
J0 - Journal of Zhejiang University Science A
VL - 11
IS - 6
SP - 425
EP - 431
%@ 1673-565X
Y1 - 2010
PB - Zhejiang University Press & Springer
ER -
DOI - 10.1631/jzus.A0900620


Abstract: 
The filling construction of permeable geosynthetic tubes is considered. First, an analytical approach is developed to determine the internal pressure, tension and shape of the cross section of a geosynthetic tube based on its volume. An analytical solution for the drainage rate of the tube is then derived. The course of the filling construction is divided into several time intervals and the volume of the tube after each interval is obtained from the equilibrium of flow calculated from the drainage rate and filling rate. The validity of our analytical approach is tested by comparing our results with previously published experimental result. The results of this comparison indicate that our method is applicable for simulating the filling construction of permeable geosynthetic tubes.

Darkslateblue:Affiliate; Royal Blue:Author; Turquoise:Article

Reference

[1]Bao, C.G., 2008. The Principle and Application of Geosynthetic in Engineering. China Waterpower Press, Beijing, p.59-60 (in Chinese).

[2]Cantré, S., 2002. Geotextile tubes—analytical design aspects. Geotextiles and Geomembranes, 20(5):305-319.

[3]Cheng, P.H., Li, F., 2000. Study of the application of the geotextile tube in construction of embankment in soft soil area. Journal of Yancheng Institute of Technology, 13(1):56-59 (in Chinese).

[4]Ghavanloo, E., Daneshmand, F., 2009. Two-dimensional analytical analysis of equilibrium shape of inflated geomembrane tube resting on rigid foundation with arbitrary shape. Geotextiles and Geomembranes, 27(2):99-106.

[5]Leshchinsky, D., Leshchinsky, O., Ling, H.I., Gilbert, P.A., 1996. Geosynthetic tubes for confining pressurized slurry: some design aspects. Journal of Geotechnical Engineering, 122(8):682-690.

[6]Liu, S.H., Hajime, M., 2007. A new earth reinforcement method by soil bags. Rock and Soil Mechanics, 28(8):1665-1670 (in Chinese).

[7]Liu, S.H., Wang, Y.S., 2007. Reinforcement mechanism of soil bags and its applications. Geotechnical Engineering Technique, 21(5):221-225 (in Chinese).

[8]Namias, V., 1985. Load-supporting fluid-filled cylindrical membranes. Journal of Applied Mechanics, 52(4):913-918.

[9]Plaut, R.H., Suherman, S., 1998. Two-dimensional analysis of geosynthetic tubes. Acta Mechanica, 129(3-4):207-218.

[10]Plaut, R.H., Klusman, C.R., 1999. Two-dimensional analysis of stacked geosynthetic tubes on deformable foundations. Thin-Walled Structures, 34(3):179-194.

[11]Plaut, R.H., Cotton, S.A., 2005. Two-dimensional vibrations of air-filled geomembrane tubes resting on rigid or deformable foundations. Journal of Sound and Vibration, 282(1-2):265-276.

[12]Qiu, C.L., Yan, Y., Yan, S.W., 2008. Behavior of geotextile tubes filled with non-uniform silty slurry. Chinese Journal of Geotechnical Engineering, 30(5):760-763 (in Chinese).

[13]Saathoff, F., Oumeraci, H., Restall, S., 2007. Australian and German experiences on the use of geotextile containers. Geotextiles and Geomembranes, 25(4-5):251-263.

[14]Seay, P.A., Plaut, R.H., 1998. Three dimensional behavior of geosynthetic tubes. Thin-Walled Structures, 32(4):263-274.

[15]Shin, E.C., Oh, Y.I., 2003. Analysis of geotextile tube behaviour by largescale field model tests. Geosynthetics International, 10(4):134-141.

[16]Song, J.F., Zhang, S.G., Zhou, L.W., Chen, X.X., 2006. Application research of the hydraulic reclamation cofferdam technology. Urban Roads Bridges & Flood Control, 4:36-39 (in Chinese).

[17]Song, W.Q., Ye, Z.H., Peng, L.Q., 2004. Study of stability of geotextile tube embankment on soft soil foundation. Yangtze River, 35(12):32-34 (in Chinese).

[18]Wang, C.Y., Watson, L.T., 1981. The fluid-filled cylindrical membrane container. Journal of Engineering Mathematics, 15(2):81-88.

[19]Zhang, W.B., Tan, J.H., 2004. Application of sand-filled geotextile tubes and the state of the art of their researches. The Ocean Engineering, 22(2):98-104 (in Chinese).

[20]Zhang, W.B., Tan, J.H., 2006. Shape and mechanical behavior of geotextile tubes. Journal of Donghua University, 23(2):8-12.

Open peer comments: Debate/Discuss/Question/Opinion

<1>

Please provide your name, email address and a comment





Journal of Zhejiang University-SCIENCE, 38 Zheda Road, Hangzhou 310027, China
Tel: +86-571-87952783; E-mail: cjzhang@zju.edu.cn
Copyright © 2000 - 2024 Journal of Zhejiang University-SCIENCE