Full Text:   <2663>

Summary:  <1927>

CLC number: U213.2

On-line Access: 2024-08-27

Received: 2023-10-17

Revision Accepted: 2024-05-08

Crosschecked: 2018-11-27

Cited: 0

Clicked: 4492

Citations:  Bibtex RefMan EndNote GB/T7714

 ORCID:

Zui Chen

https://orcid.org/0000-0001-9317-0591

Jie-ling Xiao

https://orcid.org/0000-0002-4692-7464

-   Go to

Article info.
Open peer comments

Journal of Zhejiang University SCIENCE A 2018 Vol.19 No.12 P.939-950

http://doi.org/10.1631/jzus.A1800162


Effects of initial up-warp deformation on the stability of the CRTS II slab track at high temperatures


Author(s):  Zui Chen, Jie-ling Xiao, Xiao-kai Liu, Xue-yi Liu, Rong-shan Yang, Juan-juan Ren

Affiliation(s):  MOE Key Laboratory of High-speed Railway Engineering, Southwest Jiaotong University, Chengdu 610031, China; more

Corresponding email(s):   xjling@swjtu.cn

Key Words:  High-speed railway, China Railway Track System type II (CRTS II) slab track, Initial up-warp, High temperature, Stability


Zui Chen, Jie-ling Xiao, Xiao-kai Liu, Xue-yi Liu, Rong-shan Yang, Juan-juan Ren. Effects of initial up-warp deformation on the stability of the CRTS II slab track at high temperatures[J]. Journal of Zhejiang University Science A, 2018, 19(12): 939-950.

@article{title="Effects of initial up-warp deformation on the stability of the CRTS II slab track at high temperatures",
author="Zui Chen, Jie-ling Xiao, Xiao-kai Liu, Xue-yi Liu, Rong-shan Yang, Juan-juan Ren",
journal="Journal of Zhejiang University Science A",
volume="19",
number="12",
pages="939-950",
year="2018",
publisher="Zhejiang University Press & Springer",
doi="10.1631/jzus.A1800162"
}

%0 Journal Article
%T Effects of initial up-warp deformation on the stability of the CRTS II slab track at high temperatures
%A Zui Chen
%A Jie-ling Xiao
%A Xiao-kai Liu
%A Xue-yi Liu
%A Rong-shan Yang
%A Juan-juan Ren
%J Journal of Zhejiang University SCIENCE A
%V 19
%N 12
%P 939-950
%@ 1673-565X
%D 2018
%I Zhejiang University Press & Springer
%DOI 10.1631/jzus.A1800162

TY - JOUR
T1 - Effects of initial up-warp deformation on the stability of the CRTS II slab track at high temperatures
A1 - Zui Chen
A1 - Jie-ling Xiao
A1 - Xiao-kai Liu
A1 - Xue-yi Liu
A1 - Rong-shan Yang
A1 - Juan-juan Ren
J0 - Journal of Zhejiang University Science A
VL - 19
IS - 12
SP - 939
EP - 950
%@ 1673-565X
Y1 - 2018
PB - Zhejiang University Press & Springer
ER -
DOI - 10.1631/jzus.A1800162


Abstract: 
initial up-warp deformation is one of the key factors that affect the stability of the china Railway Track System type II (CRTS II) slab track. Through modeling analysis, we studied the effects of different initial up-warp conditions on the deformation and stability of a slab track at high temperatures. Based on the theory of ‘variable span length’ in continuous welded rail (CWR), a vertical stability analysis model of the CRTS II slab track was established using the finite element method (FEM), and a scale model test was conducted. The effects of initial up-warp deformation features, such as rise displacement, span length, and line type on the stability of track slabs at high temperatures were studied through simulation. Results showed that the trends of vertical displacement were almost the same based on the FEM, analytical method, and on-site testing, but there was a better agreement between results from the FEM and the analytical method. When the span length was 6.5 m and the rise displacement of the initial up-warp reached 15 mm, compressional destruction was most likely to occur on the concrete at the bottom of the apex. The rise-span ratio of the slab up-warp reached its maximum when the initial up-warp span was 6.5 m at high temperatures. It is easier for track slabs to maintain their original form at a high temperature when there is an angle at the apex or a smooth boundary. However, with a smooth boundary, the concrete at the bottom of the apex is more likely to suffer compressional destruction. Therefore, to ensure the stability of the CRTS II slab track, an initial up-warp with a span of 6.5 m and a rise of 15 mm should be avoided, and the effects of different line types of the initial up-warp also need to be considered.

This is an interesting work on vertical stability analysis model of CRTS II Slab Track based on the theory of "variable span length" in continuous welded rail (CWR) and finite element method (FEM). Results show that when span length is 6.5m, and rise displacement of initial up-warp reaches 15mm, compressional destruction is most susceptible to occur on the concrete at the bottom of the apex.

初拱变形对CRTSII型板式轨道高温稳定性影响研究

目的:初拱变形是影响CRTSII型板式轨道垂向稳定性的关键因素之一. 通过建模分析,深入研究初拱变形的不同特征量,即矢度、弦长和线型,对其受力变形及高温稳定性的影响.
方法:基于变波长变形曲线建立CRTS II型板垂向稳定性分析理论,开展缩尺模型试验验证,并通过有限元法进行计算仿真.
结论:有限元法、解析法与现场试验所得垂向上拱位移的变化趋势一致,有限元法与解析法结果吻合更好. 轨道板初拱弦长为6.5 m且初拱矢度超过15 mm时,拱顶处下缘混凝土最易发生受压破坏. 在高温环境下,初拱弦长为6.5 m的轨道板上拱矢跨比最大. 拱顶存在折角、初拱段边界平滑的轨道板在高温环境下更容易保持原有形态,但后者于拱顶处下缘的混凝土更容易发生受压破坏. 故为确保CRTS II型板的稳定性,应避免弦长达到6.5 m且矢度超过15 mm的初始上拱,另需关注不同初拱线型对轨道板上拱的影响.

关键词:高速铁路;CRTS II型板式轨道;初拱变形;高温;稳定性

Darkslateblue:Affiliate; Royal Blue:Author; Turquoise:Article

Reference

[1]Cao SH, Yang RS, Su CG, et al., 2016. Damage mechanism of slab track under the coupling effects of train load and water. Engineering Fracture Mechanics, 163:160-175.

[2]Crisfield MA, 1982. Accelerated solution techniques and concrete cracking. Computer Methods in Applied Mechanics and Engineering, 33(1-3):585-607.

[3]Esveld C, 2001. Modern Railway Track (2nd Edition). MRT-Productions, Zaltbommel, the Netherlands, p.194-201.

[4]Fang YT, 2011. On China’s high-speed railway technology. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 12(12):883-884.

[5]Gao L, Liu YN, Zhong YL, et al., 2016. Influence of damage of wide and narrow joints on mechanical performance of CRTS II slab-type ballastless track CWR. Railway Engineering, 56(5):58-63 (in Chinese).

[6]Han J, Zhao GT, Xiao XB, et al., 2015. Effect of softening of cement asphalt mortar on vehicle operation safety and track dynamics. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 16(12):976-986.

[7]Kish A, Samavedam G, Jeong D, 1982. Analysis of Thermal Bucking Tests on U.S. Railroads. Technique Report No. NTIS-PB83-203554, Office of Research and Development, Federal Railroad Administration, US, p.21-102.

[8]Lichtberger B, 2005. Track Compendium: Formation, Permanent Way, Maintenance, Economics. Eurail Press, Hamburg, Germany, p.309-331.

[9]Lin N, Park N, Kang Y, 2003. Stability of continuously welded track. Computers & Structures, 81(22-23):2219-2236.

[10]Liu FS, Zeng ZP, Wu B, 2015. Research on the CRTS II slab ballastless track buckling deformation in the process of construction. Journal of Railway Engineering Society, 32(1):55-60 (in Chinese).

[11]Liu XY, Zhao PR, Yang RS, et al., 2010. Design Theory and Method of Ballastless Track of Passenger Dedicated Railways. Southwest Jiaotong University Press, Chengdu, China, p.1-24 (in Chinese).

[12]Liu Y, Feng J, 2016. Treatment of upheaval of CRTS II-type ballastless track slab for Beijing-Tianjin intercity railway. Railway Engineering, 56(2):142-145 (in Chinese).

[13]Long G, Liu H, Ma K, et al., 2018. Development of high performance self-compacting concrete applied for filling layer of high-speed railway. Journal of Materials in Civil Engineering, 30(2):04017268.

[14]Mallardo V, Alessandri C, 2004. Arc-length procedures with BEM in physically nonlinear problems. Engineering Analysis with Boundary Elements, 28(6):547-559.

[15]Martinez IN, Sanchis IV, Fernandez PM, et al., 2015. Analytical model for predicting the buckling load of continuous welded rail tracks. Proceedings of the Institution of Mechanical Engineers Part F: Journal of Rail & Rapid Transit, 229(5):542-552.

[16]Reissner E, 1946. Analysis of shear lag in box beams by the principle of minimum potential energy. Quarterly of Applied Mathematics, 4(3):268-278.

[17]Ren JJ, Deng SJ, Jin ZB, et al., 2017. Energy method solution for the vertical deformation of longitudinally coupled prefabricated slab track. Mathematical Problems in Engineering, 2017(1):1-11.

[18]Rybkin V, Nastechikn MP, Nastechik NP, et al., 2013. Stability issues of the continuous welded rail track on the concrete sleepers on the curves with radius R≤300 m. Sciences in Cold & Arid Regions, 5(5):654-658.

[19]Shahba A, Rajasekaran S, 2012. Free vibration and stability of tapered Euler–Bernoulli beams made of axially functionally graded materials. Applied Mathematical Modelling, 36(7):3094-3111.

[20]Tan P, Ma JE, Zhou J, et al., 2016. Sustainability development strategy of China’s high-speed rail. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 17(12):923-932.

[21]Tao GQ, Du X, Zhang HJ, et al., 2017. Development and validation of a model for predicting wheel wear in high-speed trains. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 18(8):603-616.

[22]Wei H, 2014. Research on the Track Irregularities Survey Theory and Relevant Adjustment Technologies of HSR Track. PhD Thesis, Nanchang University, Nanchang, China, p.18-22 (in Chinese).

[23]Yan B, Dai GL, Guo WH, et al., 2015. Longitudinal force in continuously welded rail on long-span tied arch continuous bridge carrying multiple tracks. Journal of Central South University, 22(5):2001-2006.

[24]Yang JB, Zeng Y, Liu XY, et al., 2015. Stability of CRTS-II slab track based on energy norm. Journal of Central South University (Science and Technology), 46(12):4707-4712 (in Chinese).

[25]Zhang J, Xiao XB, Sheng XZ, et al., 2017. Characteristics of interior noise of a Chinese high-speed train under a variety of conditions. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 18(8):617-630.

[26]Zhang XM, Chen XF, 2007. A convenient computational method for analyzing the stability of continuously welded rail tracks. Journal of the China Railway Society, 29(1):124-126 (in Chinese).

[27]Zhang XM, Zhao L, 2018. Research on the stability theory of CRTS II slab ballastless track on high-speed railway. Journal of Railway Engineering Society, 35(1):49-55 (in Chinese).

[28]Zhao GT, 2010. Manufacturing technology of CRTS II ballastless track slab. Railway Construction Technology, 6:62-65 (in Chinese).

[29]Zhou M, Dai GL, 2015. Stability of longitudinally connected ballastless slab track on simply-supported beam bridges of high-speed railway. Journal of the China Railway Society, 37(8):60-65 (in Chinese).

[30]Ziegler H, 1977. Principle of Structure Stability (2nd Edition). Birkhäuser, Basel, Switzerland, p.1-32.

Open peer comments: Debate/Discuss/Question/Opinion

<1>

Please provide your name, email address and a comment





Journal of Zhejiang University-SCIENCE, 38 Zheda Road, Hangzhou 310027, China
Tel: +86-571-87952783; E-mail: cjzhang@zju.edu.cn
Copyright © 2000 - 2024 Journal of Zhejiang University-SCIENCE