| index | Title |
| 1 | Slope stability hazard management systems Author(s):FREDLUND Delwyn G. Clicked:7777 Download:4628 Cited:2 <Full Text> Journal of Zhejiang University Science A 2007 Vol.8 No.11 P.1695-1711 DOI:10.1631/jzus.2007.A1695 |
| 2 | Exothermic process of cast-in-place pile foundation and its thermal agitation of the frozen ground under a long dry bridge on the Qinghai-Tibet Railway Author(s):Ya-ping WU, Jian GUO, Chun-xiang GUO, Wei MA, Xiao-jun WANG Clicked:33610 Download:5171 Cited:1 <Full Text> Journal of Zhejiang University Science A 2010 Vol.11 No.2 P.88-96 DOI:10.1631/jzus.A0900522 |
| 3 | Field investigation on effects of railway track geometric parameters on rail wear Author(s):SADEGHI J., AKBARI B. Clicked:8417 Download:4681 Cited:0 <Full Text> Journal of Zhejiang University Science A 2006 Vol.7 No.11 P.1846-1855 DOI:10.1631/jzus.2006.A1846 |
| 4 | Dynamics of a prestressed Timoshenko beam subject to arbitrary external load Author(s):Ji-qing Jiang, Gui-ru Ye Clicked:7513 Download:4948 Cited:1 <Full Text> Journal of Zhejiang University Science A 2010 Vol.11 No.11 P.898-907 DOI:10.1631/jzus.A1000057 |
| 5 | On China’s High-Speed Railway Technology Author(s):You-tong Fang Clicked:7969 Download:4075 Cited:3 <Full Text> Journal of Zhejiang University Science A 2011 Vol.12 No.12 P.883-885 DOI:10.1631/jzus.A11GT000 |
| 6 | Smart elasto-magneto-electric (EME) sensors for stress monitoring of steel structures in railway infrastructures Author(s):Yuan-feng Duan, Ru Zhang, Yang Zhao, Siu-wing Or, Ke-qing Fan, Zhi-feng Tang Clicked:7255 Download:4665 Cited:13 <Full Text> Journal of Zhejiang University Science A 2011 Vol.12 No.12 P.895-901 DOI:10.1631/jzus.A11GT007 |
| 7 | A two-layer optimization model for high-speed railway line planning Author(s):Li Wang, Li-min Jia, Yong Qin, Jie Xu, Wen-ting Mo Clicked:8435 Download:5665 Cited:7 <Full Text> Journal of Zhejiang University Science A 2011 Vol.12 No.12 P.902-912 DOI:10.1631/jzus.A11GT016 |
| 8 | Sensor network architecture for intelligent high-speed train on-board monitoring Author(s):Xiao-fan Wu, Chun Chen, Jia-jun Bu, Gang Chen Clicked:7476 Download:4626 Cited:2 <Full Text> Journal of Zhejiang University Science A 2011 Vol.12 No.12 P.921-925 DOI:10.1631/jzus.A11GT013 |
| 9 | Design and reliability, availability, maintainability, and safety analysis of a high availability quadruple vital computer system Author(s):Ping Tan, Wei-ting He, Jia Lin, Hong-ming Zhao, Jian Chu Clicked:10560 Download:4931 Cited:4 <Full Text> Journal of Zhejiang University Science A 2011 Vol.12 No.12 P.926-935 DOI:10.1631/jzus.A11GT003 |
| 10 | Simulation software for CRH2 and CRH3 traction driver systems based on SIMULINK and VC Author(s):Qin-fen Lu, Bin Wang, Xiao-yan Huang, Ji-en Ma, You-tong Fang, Jin Yu, Wen-ping Cao Clicked:7718 Download:5885 Cited:3 <Full Text> Journal of Zhejiang University Science A 2011 Vol.12 No.12 P.945-949 DOI:10.1631/jzus.A11GT006 |
| 11 | Electromagnetic environment around a high-speed railway using analytical technique Author(s):Yong-jian Zhi, Bin Zhang, Kai Li, Xiao-yan Huang, You-tong Fang, Wen-ping Cao Clicked:6921 Download:4582 Cited:1 <Full Text> Journal of Zhejiang University Science A 2011 Vol.12 No.12 P.950-956 DOI:10.1631/jzus.A11GT004 |
| 12 | Unsteady simulation for a high-speed train entering a tunnel Author(s):Xin-hua Li, Jian Deng, Da-wei Chen, Fang-fang Xie, Yao Zheng Clicked:9317 Download:5035 Cited:3 <Full Text> Journal of Zhejiang University Science A 2011 Vol.12 No.12 P.957-963 DOI:10.1631/jzus.A11GT008 |
| 13 | Investigation of differential movement at railroad bridge approaches through geotechnical instrumentation Author(s):Debakanta Mishra, Erol Tutumluer, Timothy D. Stark, James P. Hyslip, Steven M. Chrismer, Michael Tomas Clicked:8031 Download:5676 Cited:13 <Full Text> Journal of Zhejiang University Science A 2012 Vol.13 No.11 P.814-824 DOI:10.1631/jzus.A12ISGT7 |
| 14 | Experimental and numerical prediction of railway induced vibration Author(s):Hans Verbraken, Geert Lombaert, Geert Degrande Clicked:6936 Download:4479 Cited:5 <Full Text> Journal of Zhejiang University Science A 2012 Vol.13 No.11 P.802-813 DOI:10.1631/jzus.A12ISGT8 |
| 15 | Application of polyurethane geocomposites to help maintain track geometry for high-speed ballasted railway tracks Author(s):Peter Keith Woodward, Abdellah El Kacimi, Omar Laghrouche, Gabriela Medero, Meysam Banimahd Clicked:10255 Download:9270 Cited:9 <Full Text> Journal of Zhejiang University Science A 2012 Vol.13 No.11 P.836-849 DOI:10.1631/jzus.A12ISGT3 |
